BCS® peak load boiler control

BCS® peak load boiler control

The BCS® peak load boiler control (SLK) enables the optimum feed-in of one or more peak load boilers in a biomass cogeneration plant.

BCS® peak load boiler control (SLK)

The feed-in times can be freely defined depending on the system and supply criteria. The sequence of the peak load boilers during activation is also controlled in the event that several peak load boilers are available. In addition, a “soft” feed-in is realised in order to prevent the displacement of biomass producers.

Would you like to find out more? Should we call you or would you like to receive further information by e-mail?

I am happy to be there for you!

David Hechinger is our expert for your BCS® peak load boiler control!

Conenga Group Vogel grün

BCS® – Peak load boiler control: Your advantages at a glance

  • Technical advantages

    • Optimal utilisation of biomass boilers
    • Optimum overall efficiency
    • Intuitive operation
  • Economic advantages

    • Reduction of malfunctions and necessary manual interventions (personnel costs)
    • Reduction of peak load boiler operating times (fuel costs)
  • Environmental advantages

    • Increased energy efficiency
    • Reduction of fossil fuel requirements (peak load boiler – oil/gas)

Related Links

Unsere Kunden